15-12-2007, 10:42 PM
Hi Jimmy
I have my tower up this week with the help of my Ferguson 135, (does everything it says on the box). have finished work on my 10 ft turbine execpt for blades I decided to go from turbine to tower as it was summertime rather than spend alot of time inside carving blades
I think people might underestimate the work involved in the tower so I figured if I got that done I would succeed. have yet to source heavy cable from genny to battery, plus rectifier and controller
Sourcing wood.......... I phoned two places O Higgins ,in Shantalla, Galway they do cedar which is light and strong, also a fencing firm in ballinsloe they often work with cedar might be cheaper, may not be same grade, part of the plan for 08,... hope to post photos later
Windspeed
I have my tower up this week with the help of my Ferguson 135, (does everything it says on the box). have finished work on my 10 ft turbine execpt for blades I decided to go from turbine to tower as it was summertime rather than spend alot of time inside carving blades
I think people might underestimate the work involved in the tower so I figured if I got that done I would succeed. have yet to source heavy cable from genny to battery, plus rectifier and controller
Sourcing wood.......... I phoned two places O Higgins ,in Shantalla, Galway they do cedar which is light and strong, also a fencing firm in ballinsloe they often work with cedar might be cheaper, may not be same grade, part of the plan for 08,... hope to post photos later
Windspeed